Technical

District maintains two Well sites, Sossaman Road Well Site and Cloud Well Site, delivering 1000 gpm of water thru a delivery system comprised of 14 miles of ditches and pipe laterals. Pump delivers source water at 1000 gpm or 2.23 cu ft/sec or 2″ over 1 acre in 1 hour or full head. Half head is more or less 1 cu ft/sec or 1″ over 1 acre in 1 hour. Pipe laterals provide water thur ports 8 ‘- 10″ diameter and allow .5 cu ft/sec flow or 1 ‘ over 1 acre in 2 hours. (Cubic foot is calculated using 50 psi.). Ditches are gravity fed with source at 30 psi for establishing flow rates, ports feedthur properties are based on 14 psi.

Ditches utilize slide gates on 8″-10″ ports at customer source with Lines utilizing Alfalfa Head and Lid assembly on 8″ ports on customer property.

Both Well Systems run 24 x 7  for a typical week from friday 4 am  thru wed 6 pm. Water Run split Schedules, Summer is March thur October and fall is October thru December. January thru March is reserved for major System maintenance and upgrades.

All schedules are subject to change.

All schedules are customer order hours based.
MORE THAN 60 RUN HOURS PER WELL PUMP SYSTEM ARE REGUIRED TO AUTHORIZE A SCHEDULED RUN.

ALL WATER is POTABLE WATER at the WELL PUMP SOURCE.